l PROJECTS
  • Vision:
    Uphold Three Gorges Spirit, Create Overseas Classics
  • Mission:
    Build Overseas Quality Project, Foster Grand Image
    for Pak-China Energy Cooperation

PROJECTS

About Project

The Karot Hydropower Project is an under construction run-of-river concrete-core rockfill gravity dam in Pakistan with an installed capacity of 720 MW. The Karot Hydropower Station in Pakistan is the first investment project of the Silk Road Fund, is part of the much larger CPEC China–Pakistan Economic Corridor and is expected to be completed in 2021.

The Karot project is being developed by Karot Power Company comprising Three Gorges South Asia Investment Limited, a subsidiary of China Three Gorges Corporation, China-CTGC and Associated Technologies of Pakistan. It is the first hydropower project financed by China’s Silk Road Project.

 

KAROT Hydropower Project is the 4th of the 5 cascade hydropower stations planned on Jhelum River in Pakistan, its upstream is the Azad Pattan HPP, and its downstream is the Mangla HPP. The Project is a single power generation task hydropower complex, with reservoir storage of 164.50 million m3. Its installed capacity is 720MW (4×180MW), average annual electricity output is 3436 GW•h.

 

After completion, the company will run and maintain the project for 30 years at a levelised tariff of 7.57 cents per unit after which it will be transferred to the Punjab government at a notional price of Rs1.00.https://www.youtube.com/

Designed by Solutions Player (Pvt.) Ltd